One of our customers has two switches in a virtual chassis at one of their locations
EX4300-32F:
fpc0:
-------------------------------------------------- ------------------------
Hostname: umk-swcore
Model: ex4300-32f
Junos: 20.2R3-S3.6
fpc1:
-------------------------------------------------- ------------------------
Hostname: umk-swcore
Model: ex4300-32f
Junos: 20.2R3-S3.6
It's time to upgrade. Since the switches are in active production, the user wants to do NSSU.
But when he starts NSSU he gets a message
me@430032F> request system software nonstop-upgrade /var/tmp/jinstall-ex-4300-21.4R3-S3.4-signed.tgz
Chassis ISSU Check Done
[Jul 27 12:33:54]:ISSU: Validating Image
error: Pre-provisioning not configured
error: ISSU Aborted!
[Jul 27 12:33:55]:ISSU: Error
Chassis ISSU Aborted
As Pre-provisioning is a mandatory prerequisite for NSSU, and the switches are configured as non-provisioned, the user wants to switch them to Pre-provisioning mode. The question is: How can switches that are in non-provisioned mode be transferred to Pre-provisioning mode without having to configure the switches from scratch?
Configuration of 4300 virtual chassis:
set virtual-chassis no-split-detection
set virtual-chassis member 0 mastership-priority 129
Thanx in advance,
Vik